Still 5 days of solid work to do. Floor installer showed up looked at floor and said “no way can I put this down there.”. As I suspected might be the case but the first estimator said wasn’t.
So now I get to force my wife to pick something in stock over lunch to be installed tomorrow.
Oh well, hopefully by saturday this place will be perfect, ready for tours and I’ll be at the lake.