I’m working on a project of two lots which will get two townhouses each. The owner of the property is nearing foreclosure and needs to sell the property ASAP. The buyer doesn’t want to buy the property if he cannot get a building permit. He cannot get a building permit until I finish my drawings. Each lot is a different shape so the two buildings are different shapes so two sets of drawings. The buildings have been butchered. we were expecting to get some setback variances and they were denied and we don’t have the time to do a proper design revision, its just ‘make it work’ My boss comes up behind me every 5 minutes, did you do this? did you do that? I’M FUCKING WORKING ON IT.