
in the photo on the right, only the stuff up top is good. the other stuff is scrap (+1 board cuz i oops and had to drive 1/2 back to get another) so the pile has subsided drastically. my tip-out trash door/cabinet is also down there for final cleaning and painting.
and to prevent having to go back again for another $30 board, I measure about 20 times trim a little, measure again, trim a little more, until it fits. my wife wants this done for xmas

Advertisement


Advertisement
