I’ve spent the bulk of the last month building custom cherry cabinets for my kitchen. I got them moved onto my porch yesterday. Now the hard work begins. I have 3-1/2 weeks to rip all the crap cabinets out, do a bunch of electrical work, carve in a hood vent, install the cabinets, seal the cabinets with polyurethane, paint the kitchen, redo the floors, etc, etc. No problem, right?
Oh yeah, I still have to make all the cabinet doors.
*GULP!*
Wish me luck that the asshole local building inspector doesn't notice! Luckily my nieghbors are cool.