The Sheddening: Part 3

Illustration for article titled The Sheddening: Part 3
Illustration for article titled The Sheddening: Part 3
Advertisement

We have the first lot of formwork, Oppo. This is for the main part of the shed itself. Plus all the footing holes for each end of the portal frames has been drilled.

Once this slab is poured, the additional 3 metre wide slab for the apron (foreground of the second image) can be formed and poured...