Yesterday before we left the job site we managed to get the JLG stuck, or spinning tires in the mud. So we stopp d by the shop on the way home (left 2 hours early, 1hour drive to warehouse) loaded up a few 2x12 boards in various lengths. After a few attempts got it out and lined it up to remove more asbestos via glovebag method. As I’ve shared before. (Same plant).
Advertisement
From the last time I was here: