The fireplace tiling was completed last week. TV was dropped about 6 inches, alcove was made smaller, and obviously it was completely tiled.
Advertisement
Next up, finally getting our new water heater installed, then painting the kitchen cabinets, then redoing the fireplace downstairs (will be more casual than this one, just updating the tile surround and the mantle). The projects of home ownership never end.