For Sale: 1 used infrastructure, ran when parked

Recently replaced all the switches and and a phone system for a client and moved all the old gear into the server room to be recycled. Anyone need some 10/100 switches? I think most of this stuff was installed in the early 2000s

That stack on the right is their old Mitel system, its replacement takes up a whopping 3U in the rack.

Advertisement
Illustration for article titled For Sale: 1 used infrastructure, ran when parked